
Adidas Flagship Store
Vawell Power Solutions was commissioned to supply and install a 100 kVA 11/0.4 kV distribution transformer alongside custom-engineered low-voltage (LV) distribution panels for the Adidas flagship store. The project was executed to provide a stable and reliable electrical distribution system capable of supporting the store's critical operations. By strengthening the facility's power infrastructure, we significantly minimised the risk of downtime, ensuring uninterrupted operation of lighting systems, point-of-sale (POS) terminals, HVAC equipment, and other mission-critical electrical loads.
Lekki, Lagos, Nigeria.
Lekki, Lagos, Nigeria.





